The following are a selection of projects which BAHS have designed, managed, installed and run on completed of customers since April 2008:

Replacement of borehole pump and riser main Case Study 1
Replacement of borehole pump and riser main for South East Water
Relining of two wells Case Study 2
Relining of two wells with large diameter steel pipe to reduce the risk of contamination to a public water supply
Pump testing at 80 l/s via a settling tank Case Study 3
Pump testing at 80 l/s via a settling tank
Altrum Building, Glasgow, Scotland Case Study 4
BAHS designed and installed the largest open loop ground source heating system in Scotland at the Altrum Building, Glasgow.